For those just tuning in, after months (and months and months) of planning and financial wrangling, our massive series of home improvement projects are now underway. The good news is that we're going to be getting it all over with in one fell, relatively short, swoop. The bad news is that we might possibly be crazy. Because our plan involves accomplishing almost all of the following in 2 weeks:
Today was actually Day 4 of this whacked out home improvement schedule of ours. The whole rolling snowball of insanity actually began last Wednesday -- which, I will note, was also my birthday -- with the removal of the tub. As mentioned above, it's the original cast iron clawfoot tub, over 100 years old and weighing about the same as a dumptruck. Much of its porcelain finish has worn off over the decades so we're having it refinished, which means it has to be physically relocated to the refinishers' shop in Vancouver.
The plumbers needed the tub out of the way before they could begin work, and the plumbing work needed to be done before the bathroom contractor could do their renovations, and suddenly we're in that song about the old woman who swallowed a fly. The kicker is that while the tub refinishers would pick up the tub, they would only pick it up from the street -- something about "liability" and "potential damage" and "holy crap all those stairs are you crazy, lady". Moving a tub that weighs a gazillion tons from the bathroom to the street is also not in the plumbers' wheelhouse, which meant we needed to hire movers -- because what's another contractor in a cast of thousands, really? -- to move it from the bathroom to the street. (It ended up being easier to just have the movers take the tub to the refinishers.)
Complicating all of that was the plumbing, which, like the tub, was also over 100 years old and thus had no shut off valves anywhere but at the main. So removing the tub meant turning off the water to the house until the plumbers could install shutoffs as part of the rest of the plumbing replacement, which is also why we had to time it closely with the plumbers' arrival, since we kind of, you know, need running water.
So the tub came out on schedule, and the plumbers worked their magic in two days, also on schedule. Next up on the schedule: the simultaneous arrival of the bathroom and roofing contractors today, who have this week to do their work so that the furnace, hot water heater, window replacement, Indow windows, and energy efficiency improvements can all be done next week. Also arriving today: 2+ inches of rain, finally ending months of abnormally dry weather.
Not all of the work will be done by the end of next week, unfortunately. The tub won't be back from the refinishers until mid-March, nor will the shower kit, sink, and fixtures. So what are arguably the most crucial and personally impacting portion of this whole complicated plan -- the tub/shower and toilet -- will also take the longest to be restored to normal.
The loss of our bathroom means using The Bathroom That Shall Not Be Named for toilet needs, which has the extra super duper bonus of being in the Totally Not Creepy basement. (As for bathing needs for 4 weeks, well, that's a whole other story.) This was planned insanity, to be sure, and we knew the loss of our bathroom was going to be a hardship. Somewhat less planned was that everything would get underway on my birthday, that it would coincide with a visit from The Albino and Family, or that it would come on the heels of a pretty spectacular winter storm that wreaked havoc with everyone's schedules. Completely not planned and really unnecessarily sucktacular was both of us getting struck with the flu riiiight as everything got underway, because apparently we stole Karma's lunch money in a previous life. Which meant spending the weekend that we were planning to do a lot of preparation for everything to kick into high gear instead doing a lot of sleeping and feeling generally miserable, trekking up and down two flights of stairs to go to the bathroom, and taking about four times longer than usual to empty the bathroom in preparation for the renovation.
But Karma's personal vendetta and flu obstacle notwithstanding, we were ready and waiting for the contractors bright and early this morning. It worked out that I had the day off as a work holiday, which was fortunate for coordination purposes, if not exactly relaxing when all I wanted to do was pull the covers over my head. I had to stay out of everyone's way so I spent the day in the kitchen with the kitties while a bunch of guys ripped our roof off and another pair of guys ripped out the floor of our bathroom. And in my NyQuil induced haze, I sometimes couldn't tell the difference between all the hammering and the pounding inside my skull.
The area around our house looks like the aftermath of a tornado, the front porch is overflowing with power tools and orange power cords, the toilet is in the library, my desk is functioning as a temporary vanity/medicine cabinet, and our toothbrushes are now being stored in the kitchen. But the roofing crew managed to get three layers of old roofs off in the midst of a downpour without once springing a leak, the bathroom crew laid all the tile before they left for the day, and by the end of the week, we'll have more than half of that list up there crossed off.
So, onward.